News listings
Equatorial Guinea Licence Round

energy-pedia exploration

Colombia flagColombia

South America / GoM >>> Colombia

Colombia: Parex Resources announces successful Andina Norte-1 well test in the Capachos Block


16 Jun 2019

Photo - see caption

Parex Resources has announced the testing of the Capachos Block Andina Norte-1 well in the Guadalupe Formation.

Capachos (WI Parex 50%, Ecopetrol S.A 50%): Parex, as the operator drilled the Andina Norte-1 exploration well to a total depth of 18,852 feet and encountered oil bearing reservoirs in the Une and Guadalupe formations.

Photo - see caption
The Capachos Block is located in the Llanos Basin

The primary objective, the Guadalupe reservoir was completed following a cement remediation and production testing commenced on June 5, 2019. A total of 9,398 barrels of 40 API oil, 488 barrels of water and 14 million cubic feet ('MMCF') of natural gas have been recovered to date. Over an 81 hour period the average production test rate for the well was 2,785 barrels of oil per day, 4.3 million cubic feet per day ('MMCFD') of natural gas under natural flowing conditions with a wellhead pressure of 1,420 psi. The facility restricted measured rate during the last 12 hours of testing has been 2,892 BOPD and 4.6 MMCFD of gas with a watercut of 2%. The water production from the well is believed to be remaining completion fluids as less than one third of the completion fluid has been recovered to date. Bottom hole pressure recorders in the well indicate a drawdown of approximately 15% and a pressure buildup and analysis will be conducted at the end of the test. Parex expects to produce the Guadalupe Formation in the Andina Norte-1 well.

The Andina Norte-1 well also evaluated a secondary objective, the Une Formation. The Une was tested over a 63 hour period under natural flowing conditions and recovered a total of 1,631 Barrels of 37 API Oil, 1,173 barrels of water and 3.9 MMCF of natural gas. Average production during the test was 621 barrels of oil per day, 446 barrels of water per day and 1.5 million cubic feet of gas per day. Parex believes remediation of the Une Formation would be required to isolate the water production. As the Une Formation was a secondary well objective, this zone was suspended to allow testing of the up-hole Guadalupe Formation. Parex expects that the Une reservoir will be produced later along with the Une reservoir discovered in the Andina field.

Photo - see caption

The drilling rig will be skidded on the same pad to drill the Andina-3 appraisal well

Currently the Capachos block gross production is restricted at approx. 5,100 bopd (net 2,550 bopd).

Original article link

Source: Parex Resources





Bookmark and Share


A global information service for upstream oil and gas opportunities - divestitures, farmins and farmouts and licensing rounds.


Subscriber Only Deals

Current deals: 1692
Completed deals: 5184

Company Profiles

Current Company Profiles: 2639

Corporate Activity

Current Corporate Activity articles: 3268

Companies Looking

Current number of articles: 427

Company Sales

Current Company Sales articles:1354

Geostudies

Current Geostudies articles: 637

How to subscribe

energy-pedia Jobs

RSS Feed Widget
See all jobs...


energy-pedia Databank

The energy-pedia databank contains links to information on the world financial and energy markets, including share prices, oil and gas prices and the global stock exchanges. Read more...



energy-pedia Glossary

A list of commonly used terms in the oil and gas industry. Read more...

Subscribe

Subscribe to the FREE
energy-pedia Daily Newsletter
Subscribe

Union Jack Oil 149
OPC
Bayphase
RSK Logo 149
Government of South Australia
Rose & Assocs 149
energy365
Geoespace
count geophysics
SLR Consulting logo
KL Publishing
EP Consult Energies
About energy-pedia

energy-pedia news is a FREE news service written and edited by E and P professionals for E and P professionals.

We don't just report the news, we give you the technical background as well, with additional information derived from our unique energy-pedia opportunities service.
Contact us

energy365 Ltd

238 High Street
London Colney
St Albans
UNITED KINGDOM

Tel: +44(0)1727 822675

Email: info@energy-pedia.com