
Enauta has successfully concluded the interconnection of the new well in the Atlanta Field, 7-ATL-5H-RJS ('5H') to the FPSO Petrojarl I. The well is still in the production ramp-up phase, which should end by the end of this week. The current production is of 9.7 thousand barrels per day (bbl/d). This is the first well of the drilling campaign of three new wells that started in November 2022. The other wells will be ready throughout 2023 and will wait to be connected to the FPSO Atlanta in the Full Development System ('FDS').

Currently, the daily production at Atlanta Field is approx. 16.1 thousand bbl/d.
In order to maximize the Field's production potential, Enauta concentrated its resources for the entry into operation of the 5H well. Therefore, the installation of the new pump on the well 7-ATL-2HP-RJS, and, the consequently resumption of its production, is currently planned for April.
Additionally, Enauta's operational area is evaluating, for the second quarter, a preventive stoppage in the process plant of this unit, with a consequent temporary interruption of production, for maintenance and anticipation of part of the preventive maintenance services currently planned to occur in August.
Enauta will keep the market informed of relevant events related to the matter.
Located in the Santos Basin, the Atlanta Field is operated by Enauta Energia S.A., a wholly-owned subsidiary of the Company, which owns 100% of this asset.
Source: Enauta