News listings

energy-pedia general news

Westwood Insight – Operators offering 15-year rig deals as availability dries up


24 Oct 2023

Photo - see caption

As offshore drilling rig utilisation increases and availability continues to tighten, Westwood has recorded a marked lengthening of new contract award durations, as well as for new tender opportunities.

Over the last decade, new rig deal durations peaked in 2013 for jackups and in 2014 for floating rigs (semisubmersibles and drillships). Analysis shows that the length of such deals dwindled during the prolonged downturn and eventually reached the trough in 2018 for floaters and 2019 for jackups but has picked up steam again since the global rig market recovery got under way in 2021.

On average, awarded jackup contract durations have increased 36% compared with 2021, while drillships have increased 41% and semisubs a whopping 117%.

Figure 1: Average Offshore Rig Contract Duration (Excluding Options) 2013-2023 YTD
Source: Westwood RigLogix

The areas driving these increases over the past year are quite varied according to rig type. Drillships have an average global duration of 569 days in 2023 year-to-date, driven by South America (698 days), Mexico (1,080 days), the Mediterranean (500 days), India (451 days) and West Africa (517 days).

Meanwhile semisubs are currently sitting at a global average contract duration of 384 days, and those areas driving demand are South America (414 days), Mexico (953 days), the North Sea (369 days), the Far East (627 days) and Australia (309 days).

Jackup demand is coming from quite different areas to that of deepwater rigs, and mostly where there is a strong national oil company (NOC) presence. The average global contract duration so far this year is 661 days, and the biggest areas of demand come from the Persian Gulf (1,165 days), followed by India (840 days), the Far East (528 days) and Mexico (457 days).

Since 2022, awards with the longest contract duration have been for jackups in the Middle East. Notably ADNOC Offshore awarded six deals last year, all for 15 years apiece. The same operator has since awarded a plethora of further long-term jackup deals, five of which were fixed in June this year for 10 years apiece.

Floating rig (semisub and drillship) deals have so far been fixed at up to five years in duration, seen in recent fixtures for harsh environment semisub Deepsea Stavanger and newbuild ultra-deepwater seventh generation drillship Stena Evolution.

10-year drillship deals outstanding

Westwood believes that further lengthening in average rig deals will be seen over the coming year. Interestingly, there are already 10-year tenders out in the market for a pair of drillships required for campaigns beginning in early 2025, which is unsurprising considering marketed utilisation of sixth to eighth generation assets is already at 97%.

We also expect to see further long-term deals secured for semisubs, especially within the sixth-generation harsh environment segment, where marketed utilisation is now at 100% and there is very limited availability – free of options – until the second half of 2024.

In terms of jackups, where global utilisation is now sitting at 92% and around 95% for premium, high-specification assets, Westwood anticipates further long-term contracting activity to continue. Currently, RigLogix shows outstanding requirements with durations of up to five years, but it is likely there will be more direct negotiations or new requirements to come that will outstrip this.

Figure 2: Average Offshore Rig Contract Lead Times (Between Fixture Date & Contract Start Date) 2013-2023 YTD
Source: Westwood RigLogix

Longest lead times since 2014

Historically, contract lead times (the duration between a rig contract being awarded and the deal beginning) also begin to stretch when rig availability becomes sparse. These reached their highest in 2013, when it was common for jackup, semisub and drillship deals to be fixed at least a year in advance of a campaign beginning. But by 2016, the average lead time dwindled to just 129 days, due to low utilisation and a larger pool of readily available units to choose from – hence a lack of urgency from operators.

Compared with the 10-year average lead time, 2023 is performing almost 9% higher, but has year-to-date made no improvement on 2022’s figure, with both recording an average lead time of 237 days. However, this number is still the longest recorded since the downturn hit in 2014 (248-day lead time average).

Westwood predicts that as contract duration and utilisation continue to increase, coupled with decreasing availability and dayrates heading further north, lead times will lengthen as operators become more concerned with securing the right assets for their upcoming campaigns.

Teresa Wilkie, Director – RigLogix
twilkie@westwoodenergy.com

Original article link

Source: Westwood Global Energy Group





Bookmark and Share


A global information service for upstream oil and gas opportunities - divestitures, farmins and farmouts and licensing rounds.


Subscriber Only Deals

Current Deals

Current Upstream Deals: 195

Completed Deals

Completed Upstream Deals: 6640

Company Profiles

Current Company Profiles: 2932

Corporate Activity

Current Corporate Activity articles: 4197

Companies Looking

Current number of articles: 466

Company Sales

Current Company Sales articles:1674

Geostudies

Current Geostudies articles: 1003

How to subscribe

energy-pedia Jobs

RSS Feed Widget
See all jobs...


energy-pedia Databank

The energy-pedia databank contains links to information on the world financial and energy markets, including share prices, oil and gas prices and the global stock exchanges. Read more...



energy-pedia Glossary

A list of commonly used terms in the oil and gas industry. Read more...

Subscribe

Subscribe to the FREE
energy-pedia Daily Newsletter
Subscribe

Bayphase
energy365
Syntillica
Rose & Assocs
Borchwix
Union Jack Oil 149
OPC
Merlin
Telos NRG
About energy-pedia

energy-pedia news is a FREE news service written and edited by E and P professionals for E and P professionals.

We don't just report the news, we give you the technical background as well, with additional information derived from our unique energy-pedia opportunities service.
Contact us

energy365 Ltd

238 High Street
London Colney
St Albans
UNITED KINGDOM

Tel: +44(0)1727 822675

Email: info@energy-pedia.com