News listings

energy-pedia development and production

Mongolia flagMongolia

Central & SE Asia / Australasia >>> Mongolia

Mongolia: Petro Matad announces Heron-2 drilling results


01 Oct 2024

Photo - see caption

Petro Matad, the AIM quoted Mongolian oil company, has announced that Heron-2, the first development well to be drilled on the Petro Matad operated Heron Oil Field in Block XX in the Tamsag Basin of eastern Mongolia, has reached TD and wireline logging has been completed.

Highlights

  • Heron-2 reached a total depth (TD) of 2,908m seven days ahead of schedule.
  • An oil zone of 18m gross thickness was encountered which wireline logging indicates is very likely the same stratigraphic unit as that successfully tested in the Heron-1 discovery well.
  • Production casing has been run in preparation for a well testing programme.

Drilling and logging results

The Heron-2 well reached TD seven days ahead of schedule following a smooth drilling operation with no safety or environmental issues. It encountered the primary target Cretaceous Lower Tsagaantsav Formation on prognosis. Oil and gas shows were observed from the top of the formation and an 18m thick interval of sandstone was penetrated in a similar stratigraphic position to the sandstone in Heron-1 that flowed good oil rates on well test. This interval was encountered at a depth of 2816m in Heron-2, 16m shallower than in the Heron-1 well and drilling mud was lost to the formation at the top of the unit, as it was in Heron-1, indicating a zone with good permeability.

Petrophysical evaluation of the wireline logs indicates that oil is present to the base of the sand and there is net oil pay within it of more than 5 metres. Log correlation indicates that this sandstone is very likely to be the same stratigraphic unit as the one tested successfully in Heron-1. It also has similar log calculated porosity.

Casing has been run to TD and preparations are being made for a well testing and stimulation programme over the pay zone with the ambition, in the event of successfully achieving a commercial flow rate, to put the well on stream as soon as possible. Recent heavy rains in the area have caused some logistical difficulties but the Company remains focused on getting the testing programme completed expeditiously and, based on the results, will then determine if time and weather will permit getting the well on production before the 2024 winter operational shut down in late November. The well test operations are expected to be completed during the month of October.

Photo - see caption
Heron-2 is located in Block XX (Source: Petro Matad)

Mike Buck, CEO of Petro Matad, said:

'We are encouraged by the results of Heron-2 so far. Reservoir variability is one of the main uncertainties in the Tamsag Basin, so to have found what looks very much like the same unit in Heron-2 that proved productive in the Heron-1 discovery well is pleasing. Testing operations will determine the well deliverability and the forward programme thereafter. We are keen to maintain the momentum generated in the last few months.'

Further operational updates will be provided in due course.

Original announcement link

Source: Petro Matad





Bookmark and Share


A global information service for upstream oil and gas opportunities - divestitures, farmins and farmouts and licensing rounds.


Subscriber Only Deals

Current Deals

Current Upstream Deals: 195

Completed Deals

Completed Upstream Deals: 6640

Company Profiles

Current Company Profiles: 2932

Corporate Activity

Current Corporate Activity articles: 4197

Companies Looking

Current number of articles: 466

Company Sales

Current Company Sales articles:1674

Geostudies

Current Geostudies articles: 1003

How to subscribe

energy-pedia Jobs

RSS Feed Widget
See all jobs...


energy-pedia Databank

The energy-pedia databank contains links to information on the world financial and energy markets, including share prices, oil and gas prices and the global stock exchanges. Read more...



energy-pedia Glossary

A list of commonly used terms in the oil and gas industry. Read more...

Subscribe

Subscribe to the FREE
energy-pedia Daily Newsletter
Subscribe

OPC
Rose & Assocs
energy365
Borchwix
Syntillica
Bayphase
Telos NRG
Merlin
Union Jack Oil 149
About energy-pedia

energy-pedia news is a FREE news service written and edited by E and P professionals for E and P professionals.

We don't just report the news, we give you the technical background as well, with additional information derived from our unique energy-pedia opportunities service.
Contact us

energy365 Ltd

238 High Street
London Colney
St Albans
UNITED KINGDOM

Tel: +44(0)1727 822675

Email: info@energy-pedia.com