News listings

energy-pedia development and production

Norway flagNorway

Europe / Caspian / CIS >>> Norway

Norway: Aker Solutions secures Troll Phase 3 stage II topside modification contract


30 Sep 2024

Photo - see caption

Aker Solutions has been awarded a sizeable[1] EPCIC contract by Equinor to prepare the topside of Troll A for accelerating production from the Troll West gas reservoir.

The Troll field is situated in the North Sea, 80 km northwest of Bergen, and is Norway’s largest gas producer, supplying 10 percent of Europe’s total gas needs. Troll Phase 3 involves producing the gas cap overlying the oil column in Troll West, while also continuing the production of oil. The produced gas goes to Troll A and onwards in existing infrastructure.

The scope includes engineering, procurement, construction, installation and commissioning (EPCIC) for topside modification. The purpose is to prepare the Troll A platform for receiving and processing gas from eight new wells at Troll West. 

The first stage of this development was completed in 2021 with a new module on the Troll A platform to receive and process gas from the Troll West field. Aker Solutions completed the Troll A topside modification and provided the subsea systems for the field development in Stage I. 

'We are excited to continue following the significant development of the giant Troll field and to move forward with the next step of Troll Phase 3. In-depth knowledge of Troll A, the equipment on the asset, and the modifications made in the first phase is essential, providing a strong foundation for executing this new scope,' said Paal Eikeseth, executive vice-president and head of Aker Solutions' Life Cycle segment

Aker Solutions has also been entrusted with preparing and installing equipment for the clean-up of the initial well fluids during the start-up of the wells. 

'We will have the lead responsibility for the interfaces between contractors in this project and will leverage our experience as integrators in complex energy projects, focusing on delivering high-value and optimized solutions. We are honored to be a trusted contractor and look forward to continuing the close collaboration with Equinor on Troll,' said Paal Eikeseth

Several Aker Solutions offices will be engaged in the engineering phase. Project management, detail engineering, procurement and shop engineering is executed by Aker Solutions` Stavanger office with support from Bergen and Mumbai. Construction and prefabrication will be executed at the company’s yard in Egersund. In addition, OneSubsea, of which Aker Solutions owns 20 percent, has previously been contracted for the subsea production system for this project. 

The contract will start right away and is scheduled for completion at the end of 2027. 

The contract will be booked in the Life Cycle segment as order intake for the third quarter of 2024. 

[1] Aker Solutions defines a sizeable contract as between NOK 0.5 billion and NOK 1.5 billion.

Original announcement link

Source: Aker Solutions





Bookmark and Share


A global information service for upstream oil and gas opportunities - divestitures, farmins and farmouts and licensing rounds.


Subscriber Only Deals

Current Deals

Current Upstream Deals: 195

Completed Deals

Completed Upstream Deals: 6640

Company Profiles

Current Company Profiles: 2932

Corporate Activity

Current Corporate Activity articles: 4197

Companies Looking

Current number of articles: 466

Company Sales

Current Company Sales articles:1674

Geostudies

Current Geostudies articles: 1003

How to subscribe

energy-pedia Jobs

RSS Feed Widget
See all jobs...


energy-pedia Databank

The energy-pedia databank contains links to information on the world financial and energy markets, including share prices, oil and gas prices and the global stock exchanges. Read more...



energy-pedia Glossary

A list of commonly used terms in the oil and gas industry. Read more...

Subscribe

Subscribe to the FREE
energy-pedia Daily Newsletter
Subscribe

Borchwix
Union Jack Oil 149
Bayphase
Syntillica
Telos NRG
Merlin
OPC
Rose & Assocs
energy365
About energy-pedia

energy-pedia news is a FREE news service written and edited by E and P professionals for E and P professionals.

We don't just report the news, we give you the technical background as well, with additional information derived from our unique energy-pedia opportunities service.
Contact us

energy365 Ltd

238 High Street
London Colney
St Albans
UNITED KINGDOM

Tel: +44(0)1727 822675

Email: info@energy-pedia.com